Florida SB 4-D · Milestone inspections

The law found the problem. We repair it.

Associations can no longer defer concrete, waterproofing, and exterior systems. Shoreline scopes from the inspection and performs the work — one contractor, one schedule.

Why this page exists

Florida’s milestone inspection program requires condominiums and cooperatives three stories and taller to inspect structural integrity — earlier if they sit near the coast. Reserve studies now must fund concrete, waterproofing, and exterior painting. Boards need a contractor who can execute the report, not just bid a paint job.

Read the report with you

We translate engineer findings into a sequenced scope — what is structural, what is waterproofing, what can wait.

Restore first

Spalling, exposed rebar, failed slabs, and balcony edges get rebuilt before anyone talks about color.

Waterproof the envelope

Coatings, wet seals, and joints so the next rainy season doesn’t reopen the same file.

Finish the exterior

Paint and coatings that match the building and survive salt, sun, and board photos.

Built for property managers

  • Site walks with managers and engineers
  • Phased work around occupied units
  • Photo documentation for boards
  • Concrete, waterproofing, and paint under one schedule

Send the report. We’ll send a scope.

Mention that this is a milestone or SIRS-driven project. We’ll schedule a walkthrough with your manager.